| No | Clients | Scope of Work | Location | Date |
|---|---|---|---|---|
| 01 | Marine Master | Seabed Survey And Anchorage Lifting | Simaisma Island #3 | 18/11/2018 |
| 02 | Marine Master | UWILD For VENUS As Per RINA Class | Simaisma Island #3 | 20/10/2018 |
| 03 | Santoku Senpaku | IWS For LOWLANDS SCHELDT As Per NKK Class | Doha Port | 06/09/2018 |
| 04 | Marine Master | Pluto D Barge IWS | Simaisma Island #3 | 18/04/2018 |
| 05 | Marine Master | Pluto B Barge IWS | Simaisma Island #3 | 02/04/2018 |
| 06 | Milaha | AMMAR Barge Inspection | Dafna Cornish | 31/03/2018 |
| 07 | Bourbon | Underwater Inspection For Bourbon Agathe | Mesaieed Port | 05/03/2018 |
| 08 | Marine Master | Underwater Inspection For EASTREN VIEW NKK Class | Simaisma Island #3 | 11/01/2018 |
| 09 | Tide Line INC | Underwater Inspection For ATLANTIC TREASURE NKK Class | Hamad Port | 03/01/2018 |
| 10 | Marine Master | UWILD For Spud Barge RESLAN | Simaisma Island #3 | 05/12/2018 |
| 11 | Milaha | IWS Halul 37 | Mesaieed Port | 22/11/2017 |
| 12 | Aljaber Green | Underwater Services (Welding & Coating) Lusil Project CP 10 B1 Marina District | Lusil | 10/2017 – 03/2018 |
| 13 | Al Bandary Engineering | Request For Diver To Fix 4 Nos. Silt Curtain & Clean The Discharge Foam | Lusil | 04/10/2017 |
| 14 | MILAHA | In-Water Survey LR Class For AL-BIDDA Vessel In Hamad Port | Hamad Port | 23/09/2017 |
| 15 | Qatari Saudi Company | Inspection For Hull Condition & Remove A Robe From The Propeller | Mesaieed Port | 29/09/2017 |
| 16 | North West Marine | Repair And Reconnect Of Barriers | Hilton - Doha | 20/08/2017 |
| 17 | North West Marine | Repair And Reconnect Of Barriers | Hilton - Doha | 20/08/2017 |
| 18 | Q-Con | Diving Works At QMFY Jetty In MIC | Mesaieed Port | 14/08/2017 |
| 19 | Q-Con | Diving Works At QMFY Jetty In MIC | Mesaieed Port | 14/08/2017 |
| 20 | South East Marine | Underwater Inspection For Horizon Surveyor ABS Class | Hamad Port | 10/07/2017 |
| 21 | Milaha | Underwater Survey For JINAN II | Milaha Ship Yard | 05/06/2017 |
| 22 | Al Bandary Engineering | Request For Diver To Fix 4 Nos. Silt Curtain | Lusil | 30/04/2017 |
| 23 | Marine Master | UNDERWATER SURVEY ABS CLASS FOR OCTOPUS 196 BARGE ABS Class | Simaisma Island #3 | 27/04/2017 |
| 24 | Marine Master | UWS FOR SEA CANIS TUG BOAT BV CLASS | Simaisma Island #3 | 24/04/2017 |
| 25 | Marine Master | UNDERWATER SURVEY ABS CLASS FOR OCTOPUS 195 BARGE ABS Class | Simaisma Island #3 | 17/04/2017 |
| 26 | Marine Master | UNDERWATER SURVEY ABS CLASS FOR JUPTER BARGE ABS Class | Simaisma Island #3 | 10/04/2017 |
| 27 | Marine Master | UWS FOR SEA CENTAURUS TUG BOAT NKK CLASS | Simaisma Island #3 | 07/04/2017 |
| 28 | North West Marine | Repair And Reconnect Of Barriers | Hilton - Doha | 28/03/2017 |
| 29 | Marine Master | UWS FOR MARS BARGE ABS CLASS | Siemesma Island #3 | 27/03/2017 |
| 30 | Consolidated Engineering Construction CECC | Underwater HDPE Pipes For The Waste Water Sea Outfall And For The Sea Water Intake, Installing Of 1000 Meters Underwater Pipe Line Flanges Installation | AL-KHOR Ras Matbakh | 14/03/2017 - 30/04/2017 |
| 31 | Marine Master | UNDERWATER SURVEY OF TUG SEA CORONA NKK CLASS | Siemesma Island #3 | 14/03/2017 |
| 32 | DESCON & Q-Chem | Underwater Support For Cleaning Stop Locks Through Guides & Recording For Q-CHEM Planet Shut Down | Mesaieed Port Q-Chem Planet | 28/01/2017 - 03/02/2017 |
| 33 | HALUL H.O.S.C | Underwater Survey For HALUL 11 & HALUL 12 LIOYDS CLASS | Mesaieed Port | 25/01/2017 |
| 34 | SCI | Blocking For DISHA LNG Vessel Intake Hole For Internal Maintenance & Remove Blocker After Finishing | Anchorage Area Of Qatar | 22/01/2017 |
| 35 | Consolidated Engineering Construction CECC | Underwater HDPE Pipes For The Waste Water Sea Outfall And For The Sea Water Intake, Installing Of 500 Meters Underwater Pipe Line | AL-KHOR Ras Matbakh | 10/01/2017 - 17/01/2017 |
| 36 | NKOM | Seabed Survey For Rig AL-Doha | Ras Laffan Port | 13/12/2016 |
| 37 | NKOM | Docking For RIG MSHERB | Ras Laffan Port | 09/12/2016 |
| 38 | REDCO | Fixing 30 Clamps With Lights On Piles | Katara | 06/12/2016 |
| 39 | DBB | Lying Of Geotextile- Approx. 350 Linear Meters Ranging From -6.0m To -2.0m Screeding Of Gravel Material- Aprox 350m X 6m Width Placing Of PC Blocks- Approx. 550nos Starting From -4.5m Depth | DUBAI, UAE Al-Garhood Bridge Project | 19/11/2016 - 31/12/2016 |
| 40 | DBB | Installing Two Outfalls Pipe Lines | DUBAI, UAE Marsa Alseef Project | 12/10/2016 - 7/11/2016 |
| 41 | DUCCOR | Underwater Welding (760 Anodes) Sheet & Tubular Piles | DUBAI, UAE Marsa Alseef Project | 15/09/2016 |
| 42 | Wintershall | Three Years Contract For Construction Of A Platform And Other Diving Services As Requested | Abu Dhabi, UAE | 10/08/2016 |
| 43 | Marine Master | Underwater Inspection For DURAMEY Barge | Simaisma Island #3 | 02/08/2016 |
| 44 | Marine Master | Underwater Inspection For MERCURY Barge | Simaisma Island #3 | 27/07/2016 |
| 45 | Sultan International | Underwater Inspection For Tug ALSAFLIAH | Ras Abu Abood | 18/07/2016 |
| 46 | Contraco | Analysis Of Seabed Slit Deposition | Zubara | 10/07/2016 |
| 47 | Marine Master | Pluto B Barge Underwater Services | Simaisma Island #3 | 09/07/2016 |
| 48 | NKOM | Docking For Halul 41 | Ras Laffan Port | 08/07/2016 |
| 49 | HBK | Fixing & Installing 6 Nos. Of Gate Valves On Suction Pipe Line | New Doha Port Project | 20/06/2016 - 22/06/2016 |
| 50 | Qatar Shipping | Underwater Class Inspection For 2 Tug Boats | Mesaieed Port | 25/05/2016 |
| 51 | Q-Con | Seabed Survey In Mesaieed Port | Mesaieed Port | 10/05/2016 |
| 52 | Banana Island Resort Doha | Clean Underwater Suction Ports Of Suction Lines For 12 Boat | Banana Island Resort | 04/05/2016 |
| 53 | Ducorr | Welding Of 2,000 Anodes For Tubular Piles & Sheet Piles Cutting Of 150m Sheet Piles | Dubai, UAE Marsa Alseef Project | 22/04/2016 - 22/06/2016 |
| 54 | NDSQ | Diving Services For Cleaning Propellers For 2-Tugboats | Ras Laffan Port | 12/04/2016 |
| 55 | Marine Master | UWILD ABS Survey For Barge “URANUS” | Simaisma Island #3 | 12/04/2016 |
| 56 | Dicotech | Underwater Piles Repairing | Pearl Qatar | 7/04/2016 - 10/04/2016 |
| 57 | Process Dynamics | Removing Jammed Propeller | Doha Anchorage Area | 20/03/2016 |
| 58 | Qatar Shipping | Underwater Hull Inspection | Mesaieed Port | 07/03/2016 |
| 59 | Sea Works Co | Underwater Hull Inspection | Lussil | 06/03/2016 |
| 60 | ANANTARA | Pile Jacket Replacement | Banana Island | 26/01/2016 |
| 61 | NKOM | Lifting For Um AL ROUS | Ras Laffan Port | 12/01/2016 |
| 62 | NKOM | UWILD For AL JASSRA RIG ABS | Ras Laffan Port | 28/12/2015 - 5/01/2016 |
| 63 | NKOM | UWILD For AL SAFLIYA Lifting Boat | Ras Laffan Port | 25/12/2015 - 27/12/2015 |
| 64 | CECC | Laying Out Pipe Line Sea Bed Survey | Al Khor Ras Matbakh | 19/12/2015 |
| 65 | BOURBON | Remove Rope From Jammed Propeller | Ras Laffan Port | 15/12/2015 |
| 66 | Nakilat Agency | Propeller Rope Removing TUG DT13 | Ras Laffan Port | 11/12/2015 |
| 67 | NKOM | Seabed Survey | Ras Laffan Port | 10/12/2015 |
| 68 | Nakilat Agency | Propeller Rope Removing For SHAREIF RELIANCE | Ras Laffan Port | 02/12/2015 |
| 69 | NKOM | Docking For ALSAFLIA | Ras Laffan Port | 01/12/2015 |
| 70 | WOQOD | In Water Survey For SIDRA AL WAJBAH | Mesaieed Port | 26/11/2015 |
| 71 | NKOM | Seabed Survey | Ras Laffan Port | 23/11/2015 |
| 72 | BOSKALIS | Underwater Inspection For Pomba Barge ABS Class | Simaisma | 19/11/2015 |
| 73 | BOSKALIS | Underwater Cleaning For Pomba Barge | Simaisma | 18/11/2015 |
| 74 | NKOM | Docking For MT GIANNIS | Ras Laffan Port | 17/11/2015 |
| 75 | NKOM | Underwater Inspection To Check The Silt Deposits | Ras Laffan Port | 14/11/2015 |
| 76 | BOSKALIS | Removing Of Jammed Propeller | Simaisma | 10/11/2015 |
| 77 | REDCO | Underwater Pile Cutting | Katara | 08/11/2015 |
| 78 | NKOM | VESSEL Lifting | Ras Laffan Port | 23/09/2015 |
| 79 | NKOM | Diving Services For Blanking Sea Chest | Ras Laffan Port | 16/09/2015 - 18/09/2015 |
| 80 | NKOM | Underwater Docking Services | Ras Laffan Port | 08/09/2015 |
| 81 | NSW | Diving Services (Lifting Services) | Ras Laffan Port | 04/09/2015 |
| 82 | NKOM GDI (Owner) | Sea Bed Survey For Rig " Msheireb" | Ras Laffan Port | 03/09/2015 |
| 83 | Bourbon | Underwater Class Inspection For "BL 304" Vessel | Mesaieed Port | 30/08/2015 |
| 84 | Boskalis | Underwater Class Inspection For " BKM 102" Vessel BV Class | Simismia | 20/08/2015 |
| 85 | Halul H.O.S.C | Underwater Inspection For "Halul 25" Vessel (Class LR) | Mesaieed Port | 16/08/2015 |
| 86 | NKOM | Diving Services For Vessel Docking "Al Thakira" | Ras Laffan Port | 13/08/2015 |
| 87 | MILAHA | Underwater Inspection For Floating Dock "Al Ruffa II" | Mesaieed Port | 12/08/2015 |
| 88 | Sea Horse Middle East | Underwater Inspection For Barge "B2002" | Simisima | 06/08/2015 |
| 89 | Boskalis | Diving Services At QZE3 Site | Al Wakra | 02/08/2015 - 15/08/2015 |
| 90 | Boskalis | Underwater Inspection For "MCS Rosie" Vessel | Simisima | 16/07/2015 |
| 91 | Halul H.O.S.C | In Water Survey For "Halul 26" Vessel (LR Class) | Mesaieed Port | 08/07/2015 |
| 92 | Bourbon | Underwater Inspection For "BL 303" Vessel | Mesaieed Port Milaha Ship Yard | 07/07/2015 |
| 93 | Bourbon | Underwater Cleaning For "BL 303" Vessel | Mesaieed Port Milaha Ship Yard | 06/07/2015 |
| 94 | Boskalis | Replace A Broken Wire Of Box Anchor | Simisma | 02/07/2015 |
| 95 | Halul H.O.S.C | Underwater Inspection For "Halul 17" Lloyd’s Class | Mesaieed | 29/06/2015 |
| 96 | NKOM | Underwater Docking For " Hafnia Arctic" Vessel | Ras Laffan Port | 27/06/2015 |
| 97 | WSS Doha | Underwater Inspection For "Santa Marta" Vessel (ABS Class) | Outer Anchorage Area | 26/06/2015 |
| 98 | Boskalis | Underwater Inspection For "Taurus II" Hull And Rudder | Al Wakra | 25/06/2015 |
| 99 | NKOM | Underwater Lifting For "Allianz Hermes " Vessel | Ras Laffan Port | 25/06/2015 |
| 100 | NKOM | Underwater Inspection For "BIG ORANGE 25" | Ras Laffan Port | 14/06/2015 |
| 101 | Boskalis | Underwater Inspection For "Inchape 19" Vessel | AL Wakra | 12/06/2015 |
| 102 | Techonar | In Water Survey For " M/V Lindsay Lou" BV Class | Mesaieed Port | 11/06/2015 |
| 103 | NDSQ | Underwater Lifting For "KOC Kaser" Vessel | Ras Laffan Port | 08/06/2015 |
| 104 | NKOM | Underwater Docking For "LEIV ERIKKSON" Vessel | Ras Laffan Port | 03/06/2015 |
| 105 | NKOM | Underwater Docking For "BIG ORAGNE 25" Vessel | Ras Laffan Port | 02/06/2015 |
| 106 | NKOM | Underwater Lifting For "TGB_25" Vessel | Ras Laffan Port | 01/06/2015 |
| 107 | Boskalis | Connecting Steel Wire To Sunk Pipe And Disconnect Slit Screen | Simisima | 23/05/2015 |
| 108 | NSW | In Water Survey For TB 57 CHIPLUN (Lloyd Class Vessel) | Ras Laffan Port | 20/5/2015 |
| 109 | Milaha | Preventive Maintenance For Floating Jetty | Doha Port | 14/05/2015 |
| 110 | NSW | In-Water Survey For "TB64 Hadd Al Theeb" Llloyd’s Class | Ras Laffan Port | 02/05/2015 |
| 111 | UCC | Seabed Survey And Picking Scaffolding | Banana Island | 28/04/2015 |
| 112 | NKOM | Underwater Vessel Lifting For "DUK YOUNG" | Ras Laffan Port | 24/04/2015 |
| 113 | Boskalis | Remove Steel Chain From The Starboard Propeller For BKM 102 | Simisima | 19/04/2015 |
| 114 | Boskalis | Underwater Propeller Inspection (BKM 102 - BKS 292 - MCS NIKKI) | Simisima | 17/04/2015 |
| 115 | NKOM | Assistance Docking For Dean Andrew Vessel | Ras Laffan Port | 15/04/2015 |
| 116 | Boskalis | Underwater Inspection For "Taurus II" Vessel BV Class | Simisima | 15/04/2015 |
| 117 | NKOM | Docking Operation For Al Jasra Vessel | Ras Laffan Port | 10/04/2015 |
| 118 | Allianz Marine & Qatar Gas | Replacement Of 1 X Fender At QG WHP-7 | NFB Qatar Gas Field Offshore | 09/04/2015 - 12/04/2015 |
| 119 | Boskalis | Underwater Cleaning For "Taurus II" Vessel | Siemesma | 05/04/2015 |
| 120 | NKOM | Underwater Inspection (UWILD) For "Halul 63" Vessel | Ras Laffan Port | 04/04/2015 |
| 121 | Zakher Marine | Underwater Inspection For " Zakher Emperor" Vessel | Doha Port | 27/03/2015 |
| 122 | UCC | Supplying And Installation Of D-Fender For Banana Island And Shiokh Port Jetties | Banana Island Shiokh Jetty | 28/03/2015 - 10/04/2015 |
| 123 | NKOM | Lifting Operation For "LB 11" Vessel | Ras Laffan Port | 27/03/2015 |
| 124 | MFH | Underwater Cleaning Propeller, Sea Chest, Rudders | Doha Port Anchorage Area | 23/03/2015 |
| 125 | Resolve | Salvage Operations For "Al Salamah Barge | Mesaieed Port | 05/03/2015 - 19/03/2015 |
| 126 | NDSQ | Lifting Operations For "Al ADIAD" Vessel | Ras Laffan Port | 04/03/2015 |
| 127 | NKOM | Diving Operations For "Halul 12" | Ras Laffan Port | 03/03/2015 |
| 128 | NKOM | Diving Services For Inspection Of Port Outboard Jet Bucket | Ras Laffan Port | 26/02/2015 |
| 129 | NKOM | Lifting Operation For "Halul 11" Vessel | Ras Laffan Port | 13/02/2015 |
| 130 | NKOM | Docking Operation For "AHT SCOUT" Vessel | Ras Laffan Port | 10/02/2015 |
| 131 | NKOM | Docking Operation For "RV_JANAN" Vessel | Ras Laffan Port | 08/02/2015 |
| 132 | NKOM | Removal Of PP Rope For "MV_Gloria" Vessel | Ras Laffan Port | 07/02/2015 |
| 133 | UCC | Underwater Welding Fenders For Pile (2 Ton Fender Weight) | Banana Island | 30/01/2015 |
| 134 | Brand Marine Consultant | Under Water Salvage For "AL Salamah" Barge | Mesaieed Port | 28/01/2015 - 02/02/2015 |
| 135 | NKOM | Lifting Operations For "BKS-292" Vessel | Ras Laffan Port | 26/01/2015 |
| 136 | NKOM | Diving Operations For "AHT SCOUT" And "TOPAX SHAHEEN" Vessels | Ras Laffan Port | 24/01/2015 |
| 137 | Boskalis | Bottom Survey On The Guayas – BV Class | Semaisma | 19/01/2015 |
| 138 | NKOM | Diving Operation For 'SM 1 Reem' | Ras Laffan Port | 18/01/2015 |
| 139 | NDSQ | Lifting "AL SAILIYA" Yacht At Phase #5 | Ras Laffan Port | 15/01/2015 |
| 140 | NKOM | Lifting Boat At Phase #5 BKM 102 | Ras Laffan Port | 13/01/2015 |
| 141 | NKOM | Collecting Drowned Hook | Ras Laffan Port | 09/01/2015 |
| 142 | NKOM | Lifting Boat At Phase #5 BKM 103 | Ras Laffan Port | 06/01/2015 |
| 143 | NKOM | Lifting Boat At Phase #5 M/Y ZIKRIT | Ras Laffan Port | 04/01/2015 |
| 144 | NKOM | Lifting Supply TGB 22 | Ras Laffan Port | 01/01/2015 |
| 145 | Zakher Marie | UWILD Zakher Vessel | Doha Port | 24/12/2014 |
| 146 | NKOM | Assisting Vessel Docking DSV SHADDAD | Ras Laffan Port | 23/12/2014 |
| 147 | SVITZER | Installing A New Man Hole On SALAMA Barge | Mesaieed Port | 09/12/2014 - 11/12/2014 |
| 148 | NKOM | Diving Operation For Laffan #1 Barge | Ras Laffan Port | 05/12/2014 |
| 149 | NKOM | Diving Operation For MIRQAB Vessel Lifting | Ras Laffan Port | 30/11/2014 |
| 150 | NKOM | Underwater Cutting For Pad Eye 150mm And Remove The Hook | Ras Laffan Port | 17/11/2014 |
| 151 | NKOM | Seabed Survey For Dixie Patriot | Ras Laffan Port | 09/11/2014 |
| 152 | NKOM | Emergency Docking For DIXIE PATRIOT | Ras Laffan Port | 29/10/2014 |
| 153 | Qatar Quarries & Building Materials | Underwater Survey For Laffan 1 Barge ABS Class | Ras Laffan Port Area M16 | 30/09/2014 |
| 154 | NKOM | Docking Operation In Dock #2 | Ras Laffan Port | 29/09/2014 |
| 155 | Trelco Marine | In-Water Bottom Survey For SCOUT Tug Boat DNV GL Class | Ras Laffan Port | 11/09/2014 |
| 156 | MEDCO | In-Water Bottom Survey For AL JARRAF Vessel BV Class | New Mesaieed Port | 26/08/2014 |
| 157 | MSC | In Water Survey For MSC CAPRI GL Class | Doha Port | 18/07/2014 |
| 158 | MILAHA | In Water Survey For AL RUFFA 1 Dock Lloyd's Class | Mesaieed Port Milaha Ship Yard | 09/07/2014 |
| 159 | MILAHA | Maintenance For Berth 6 - Milaha | Doha Port | 26/06/2014 - 3/07/2014 |
| 160 | Global Marine Services | In Water Survey For SHIRF HAWK BV Class | Ras Laffan Port | 23/06/2014 |
| 161 | China Harbour | Clearing A Fouling Rope On Tug DONA – 1 | Lussil | 01/06/2014 |
| 162 | Six Construct | Environmental Works (Survey On Corals Reef ) (Ecological Survey) | Mesaieed Port | 15/05/2014 - 30/05/2014 |
| 163 | Nakilat Agency | Remove Rope From Propeller Tug Fahad 1 | Ras Laffan Port | 30/04/2014 |
| 164 | Halul H.O.S.C | Underwater Inspection And Propeller Polishing For Halul 36 | Ras Laffan Port | 30/04/2014 |
| 165 | UCC | Welding Fenders To Piles | Banana Island | 27/04/2014 - 30/04/2014 |
| 166 | B Navi Ship Management | In Water Survey For ATLANT TRINA GL Class | Doha Port | 26/04/2014 |
| 167 | N KOM | SPUD CAN UWILD INTERMEDIATE SURVEY For AL DOHA RIG ABS Class | Ras Laffan Port | 28/04/2014 - 03/05/2014 |
| 168 | N KOM | Seabed Survey For AL DOHA RIG | Ras Laffan Port | 25/04/2014 |
| 169 | UCC | Air Lifting Remove Sand Of The Seabed Using Air Lift To Weld The Anode | Banana Island | 25/04/2014 |
| 170 | N KOM | Seabed Survey In Pier -2 East | Ras Laffan Port | 22/04/2014 |
| 171 | NSW | Underwater Survey Al - Dakhira Vessel | Ras Laffan Port | 18/04/2014 |
| 172 | NSW | Underwater Survey HELAITAN Vessel | Ras Laffan Port | 12/04/2014 |
| 173 | NSW | Underwater Survey HAWAR Vessel | Ras Laffan Port | 11/04/2014 |
| 174 | N-KOM | Spud Can Uwild Intermediate Ensco 97 Rig Abs Class | Ras Laffan Port | 05/04/2014 - 09/04/2014 |
| 175 | Archirodon | Wrapping Of Gio-Textile Material On Piles | Ras Laffan Port | 11/03/2014 - 18/03/2014 |
| 176 | UCC | DENSO Roto Wrap Pile Jacketing | Banana Island | 01/03/2014 - 16/03/2014 |
| 177 | NKOM | Lifting Boat Hadd Al Theeb | Ras Laffan Port | 22/02/2014 |
| 178 | NKOM | Seabed Survey To Rig Foot Print | Ras Laffan Port | 15/02/2014 |
| 179 | NKOM | Spud Can Uwild Intermediate Ensco 96 Rig Abs Class | Ras Laffan Port | 15/02/2014 - 20/02/2014 |
| 180 | Nakilat Agency | Jammed Propeller Of Tug Fahad | Ras Laffan Port | 14/02/2014 |
| 181 | Zakher Marin | Jammed Propeller/Rudder | Ras Laffan Port | 11/02/2014 |
| 182 | NKOM | Boat Launching (Bourbon Agathe) | Ras Laffan Port | 29/01/2014 |
| 183 | NKOM | Boat Launching (OPUA MULTICAT) | Ras Laffan Port | 23/01/2014 |
| 184 | MEDCO | General Visual Inspection For The Mooring System | Mesaieed Port | 21/01/2014 |
| 185 | NKOM | Lifting Boat For AL SHAMAL-PHASE 5 | Ras Laffan Port | 17/11/2013 |
| 186 | UCC | Underwater Welding For 2000 Zinc Anodes | Water Villa Piles Banana Island Jetty | 27/10/2013 |