No | Clients | Scope of Work | Location | Date |
---|---|---|---|---|
01 | Marine Master | Seabed Survey And Anchorage Lifting | Simaisma Island #3 | 18/11/2018 |
02 | Marine Master | UWILD For VENUS As Per RINA Class | Simaisma Island #3 | 20/10/2018 |
03 | Santoku Senpaku | IWS For LOWLANDS SCHELDT As Per NKK Class | Doha Port | 06/09/2018 |
04 | Marine Master | Pluto D Barge IWS | Simaisma Island #3 | 18/04/2018 |
05 | Marine Master | Pluto B Barge IWS | Simaisma Island #3 | 02/04/2018 |
06 | Milaha | AMMAR Barge Inspection | Dafna Cornish | 31/03/2018 |
07 | Bourbon | Underwater Inspection For Bourbon Agathe | Mesaieed Port | 05/03/2018 |
08 | Marine Master | Underwater Inspection For EASTREN VIEW NKK Class | Simaisma Island #3 | 11/01/2018 |
09 | Tide Line INC | Underwater Inspection For ATLANTIC TREASURE NKK Class | Hamad Port | 03/01/2018 |
10 | Marine Master | UWILD For Spud Barge RESLAN | Simaisma Island #3 | 05/12/2018 |
11 | Milaha | IWS Halul 37 | Mesaieed Port | 22/11/2017 |
12 | Aljaber Green | Underwater Services (Welding & Coating) Lusil Project CP 10 B1 Marina District | Lusil | 10/2017 – 03/2018 |
13 | Al Bandary Engineering | Request For Diver To Fix 4 Nos. Silt Curtain & Clean The Discharge Foam | Lusil | 04/10/2017 |
14 | MILAHA | In-Water Survey LR Class For AL-BIDDA Vessel In Hamad Port | Hamad Port | 23/09/2017 |
15 | Qatari Saudi Company | Inspection For Hull Condition & Remove A Robe From The Propeller | Mesaieed Port | 29/09/2017 |
16 | North West Marine | Repair And Reconnect Of Barriers | Hilton - Doha | 20/08/2017 |
17 | North West Marine | Repair And Reconnect Of Barriers | Hilton - Doha | 20/08/2017 |
18 | Q-Con | Diving Works At QMFY Jetty In MIC | Mesaieed Port | 14/08/2017 |
19 | Q-Con | Diving Works At QMFY Jetty In MIC | Mesaieed Port | 14/08/2017 |
20 | South East Marine | Underwater Inspection For Horizon Surveyor ABS Class | Hamad Port | 10/07/2017 |
21 | Milaha | Underwater Survey For JINAN II | Milaha Ship Yard | 05/06/2017 |
22 | Al Bandary Engineering | Request For Diver To Fix 4 Nos. Silt Curtain | Lusil | 30/04/2017 |
23 | Marine Master | UNDERWATER SURVEY ABS CLASS FOR OCTOPUS 196 BARGE ABS Class | Simaisma Island #3 | 27/04/2017 |
24 | Marine Master | UWS FOR SEA CANIS TUG BOAT BV CLASS | Simaisma Island #3 | 24/04/2017 |
25 | Marine Master | UNDERWATER SURVEY ABS CLASS FOR OCTOPUS 195 BARGE ABS Class | Simaisma Island #3 | 17/04/2017 |
26 | Marine Master | UNDERWATER SURVEY ABS CLASS FOR JUPTER BARGE ABS Class | Simaisma Island #3 | 10/04/2017 |
27 | Marine Master | UWS FOR SEA CENTAURUS TUG BOAT NKK CLASS | Simaisma Island #3 | 07/04/2017 |
28 | North West Marine | Repair And Reconnect Of Barriers | Hilton - Doha | 28/03/2017 |
29 | Marine Master | UWS FOR MARS BARGE ABS CLASS | Siemesma Island #3 | 27/03/2017 |
30 | Consolidated Engineering Construction CECC | Underwater HDPE Pipes For The Waste Water Sea Outfall And For The Sea Water Intake, Installing Of 1000 Meters Underwater Pipe Line Flanges Installation | AL-KHOR Ras Matbakh | 14/03/2017 - 30/04/2017 |
31 | Marine Master | UNDERWATER SURVEY OF TUG SEA CORONA NKK CLASS | Siemesma Island #3 | 14/03/2017 |
32 | DESCON & Q-Chem | Underwater Support For Cleaning Stop Locks Through Guides & Recording For Q-CHEM Planet Shut Down | Mesaieed Port Q-Chem Planet | 28/01/2017 - 03/02/2017 |
33 | HALUL H.O.S.C | Underwater Survey For HALUL 11 & HALUL 12 LIOYDS CLASS | Mesaieed Port | 25/01/2017 |
34 | SCI | Blocking For DISHA LNG Vessel Intake Hole For Internal Maintenance & Remove Blocker After Finishing | Anchorage Area Of Qatar | 22/01/2017 |
35 | Consolidated Engineering Construction CECC | Underwater HDPE Pipes For The Waste Water Sea Outfall And For The Sea Water Intake, Installing Of 500 Meters Underwater Pipe Line | AL-KHOR Ras Matbakh | 10/01/2017 - 17/01/2017 |
36 | NKOM | Seabed Survey For Rig AL-Doha | Ras Laffan Port | 13/12/2016 |
37 | NKOM | Docking For RIG MSHERB | Ras Laffan Port | 09/12/2016 |
38 | REDCO | Fixing 30 Clamps With Lights On Piles | Katara | 06/12/2016 |
39 | DBB | Lying Of Geotextile- Approx. 350 Linear Meters Ranging From -6.0m To -2.0m Screeding Of Gravel Material- Aprox 350m X 6m Width Placing Of PC Blocks- Approx. 550nos Starting From -4.5m Depth | DUBAI, UAE Al-Garhood Bridge Project | 19/11/2016 - 31/12/2016 |
40 | DBB | Installing Two Outfalls Pipe Lines | DUBAI, UAE Marsa Alseef Project | 12/10/2016 - 7/11/2016 |
41 | DUCCOR | Underwater Welding (760 Anodes) Sheet & Tubular Piles | DUBAI, UAE Marsa Alseef Project | 15/09/2016 |
42 | Wintershall | Three Years Contract For Construction Of A Platform And Other Diving Services As Requested | Abu Dhabi, UAE | 10/08/2016 |
43 | Marine Master | Underwater Inspection For DURAMEY Barge | Simaisma Island #3 | 02/08/2016 |
44 | Marine Master | Underwater Inspection For MERCURY Barge | Simaisma Island #3 | 27/07/2016 |
45 | Sultan International | Underwater Inspection For Tug ALSAFLIAH | Ras Abu Abood | 18/07/2016 |
46 | Contraco | Analysis Of Seabed Slit Deposition | Zubara | 10/07/2016 |
47 | Marine Master | Pluto B Barge Underwater Services | Simaisma Island #3 | 09/07/2016 |
48 | NKOM | Docking For Halul 41 | Ras Laffan Port | 08/07/2016 |
49 | HBK | Fixing & Installing 6 Nos. Of Gate Valves On Suction Pipe Line | New Doha Port Project | 20/06/2016 - 22/06/2016 |
50 | Qatar Shipping | Underwater Class Inspection For 2 Tug Boats | Mesaieed Port | 25/05/2016 |
51 | Q-Con | Seabed Survey In Mesaieed Port | Mesaieed Port | 10/05/2016 |
52 | Banana Island Resort Doha | Clean Underwater Suction Ports Of Suction Lines For 12 Boat | Banana Island Resort | 04/05/2016 |
53 | Ducorr | Welding Of 2,000 Anodes For Tubular Piles & Sheet Piles Cutting Of 150m Sheet Piles | Dubai, UAE Marsa Alseef Project | 22/04/2016 - 22/06/2016 |
54 | NDSQ | Diving Services For Cleaning Propellers For 2-Tugboats | Ras Laffan Port | 12/04/2016 |
55 | Marine Master | UWILD ABS Survey For Barge “URANUS” | Simaisma Island #3 | 12/04/2016 |
56 | Dicotech | Underwater Piles Repairing | Pearl Qatar | 7/04/2016 - 10/04/2016 |
57 | Process Dynamics | Removing Jammed Propeller | Doha Anchorage Area | 20/03/2016 |
58 | Qatar Shipping | Underwater Hull Inspection | Mesaieed Port | 07/03/2016 |
59 | Sea Works Co | Underwater Hull Inspection | Lussil | 06/03/2016 |
60 | ANANTARA | Pile Jacket Replacement | Banana Island | 26/01/2016 |
61 | NKOM | Lifting For Um AL ROUS | Ras Laffan Port | 12/01/2016 |
62 | NKOM | UWILD For AL JASSRA RIG ABS | Ras Laffan Port | 28/12/2015 - 5/01/2016 |
63 | NKOM | UWILD For AL SAFLIYA Lifting Boat | Ras Laffan Port | 25/12/2015 - 27/12/2015 |
64 | CECC | Laying Out Pipe Line Sea Bed Survey | Al Khor Ras Matbakh | 19/12/2015 |
65 | BOURBON | Remove Rope From Jammed Propeller | Ras Laffan Port | 15/12/2015 |
66 | Nakilat Agency | Propeller Rope Removing TUG DT13 | Ras Laffan Port | 11/12/2015 |
67 | NKOM | Seabed Survey | Ras Laffan Port | 10/12/2015 |
68 | Nakilat Agency | Propeller Rope Removing For SHAREIF RELIANCE | Ras Laffan Port | 02/12/2015 |
69 | NKOM | Docking For ALSAFLIA | Ras Laffan Port | 01/12/2015 |
70 | WOQOD | In Water Survey For SIDRA AL WAJBAH | Mesaieed Port | 26/11/2015 |
71 | NKOM | Seabed Survey | Ras Laffan Port | 23/11/2015 |
72 | BOSKALIS | Underwater Inspection For Pomba Barge ABS Class | Simaisma | 19/11/2015 |
73 | BOSKALIS | Underwater Cleaning For Pomba Barge | Simaisma | 18/11/2015 |
74 | NKOM | Docking For MT GIANNIS | Ras Laffan Port | 17/11/2015 |
75 | NKOM | Underwater Inspection To Check The Silt Deposits | Ras Laffan Port | 14/11/2015 |
76 | BOSKALIS | Removing Of Jammed Propeller | Simaisma | 10/11/2015 |
77 | REDCO | Underwater Pile Cutting | Katara | 08/11/2015 |
78 | NKOM | VESSEL Lifting | Ras Laffan Port | 23/09/2015 |
79 | NKOM | Diving Services For Blanking Sea Chest | Ras Laffan Port | 16/09/2015 - 18/09/2015 |
80 | NKOM | Underwater Docking Services | Ras Laffan Port | 08/09/2015 |
81 | NSW | Diving Services (Lifting Services) | Ras Laffan Port | 04/09/2015 |
82 | NKOM GDI (Owner) | Sea Bed Survey For Rig " Msheireb" | Ras Laffan Port | 03/09/2015 |
83 | Bourbon | Underwater Class Inspection For "BL 304" Vessel | Mesaieed Port | 30/08/2015 |
84 | Boskalis | Underwater Class Inspection For " BKM 102" Vessel BV Class | Simismia | 20/08/2015 |
85 | Halul H.O.S.C | Underwater Inspection For "Halul 25" Vessel (Class LR) | Mesaieed Port | 16/08/2015 |
86 | NKOM | Diving Services For Vessel Docking "Al Thakira" | Ras Laffan Port | 13/08/2015 |
87 | MILAHA | Underwater Inspection For Floating Dock "Al Ruffa II" | Mesaieed Port | 12/08/2015 |
88 | Sea Horse Middle East | Underwater Inspection For Barge "B2002" | Simisima | 06/08/2015 |
89 | Boskalis | Diving Services At QZE3 Site | Al Wakra | 02/08/2015 - 15/08/2015 |
90 | Boskalis | Underwater Inspection For "MCS Rosie" Vessel | Simisima | 16/07/2015 |
91 | Halul H.O.S.C | In Water Survey For "Halul 26" Vessel (LR Class) | Mesaieed Port | 08/07/2015 |
92 | Bourbon | Underwater Inspection For "BL 303" Vessel | Mesaieed Port Milaha Ship Yard | 07/07/2015 |
93 | Bourbon | Underwater Cleaning For "BL 303" Vessel | Mesaieed Port Milaha Ship Yard | 06/07/2015 |
94 | Boskalis | Replace A Broken Wire Of Box Anchor | Simisma | 02/07/2015 |
95 | Halul H.O.S.C | Underwater Inspection For "Halul 17" Lloyd’s Class | Mesaieed | 29/06/2015 |
96 | NKOM | Underwater Docking For " Hafnia Arctic" Vessel | Ras Laffan Port | 27/06/2015 |
97 | WSS Doha | Underwater Inspection For "Santa Marta" Vessel (ABS Class) | Outer Anchorage Area | 26/06/2015 |
98 | Boskalis | Underwater Inspection For "Taurus II" Hull And Rudder | Al Wakra | 25/06/2015 |
99 | NKOM | Underwater Lifting For "Allianz Hermes " Vessel | Ras Laffan Port | 25/06/2015 |
100 | NKOM | Underwater Inspection For "BIG ORANGE 25" | Ras Laffan Port | 14/06/2015 |
101 | Boskalis | Underwater Inspection For "Inchape 19" Vessel | AL Wakra | 12/06/2015 |
102 | Techonar | In Water Survey For " M/V Lindsay Lou" BV Class | Mesaieed Port | 11/06/2015 |
103 | NDSQ | Underwater Lifting For "KOC Kaser" Vessel | Ras Laffan Port | 08/06/2015 |
104 | NKOM | Underwater Docking For "LEIV ERIKKSON" Vessel | Ras Laffan Port | 03/06/2015 |
105 | NKOM | Underwater Docking For "BIG ORAGNE 25" Vessel | Ras Laffan Port | 02/06/2015 |
106 | NKOM | Underwater Lifting For "TGB_25" Vessel | Ras Laffan Port | 01/06/2015 |
107 | Boskalis | Connecting Steel Wire To Sunk Pipe And Disconnect Slit Screen | Simisima | 23/05/2015 |
108 | NSW | In Water Survey For TB 57 CHIPLUN (Lloyd Class Vessel) | Ras Laffan Port | 20/5/2015 |
109 | Milaha | Preventive Maintenance For Floating Jetty | Doha Port | 14/05/2015 |
110 | NSW | In-Water Survey For "TB64 Hadd Al Theeb" Llloyd’s Class | Ras Laffan Port | 02/05/2015 |
111 | UCC | Seabed Survey And Picking Scaffolding | Banana Island | 28/04/2015 |
112 | NKOM | Underwater Vessel Lifting For "DUK YOUNG" | Ras Laffan Port | 24/04/2015 |
113 | Boskalis | Remove Steel Chain From The Starboard Propeller For BKM 102 | Simisima | 19/04/2015 |
114 | Boskalis | Underwater Propeller Inspection (BKM 102 - BKS 292 - MCS NIKKI) | Simisima | 17/04/2015 |
115 | NKOM | Assistance Docking For Dean Andrew Vessel | Ras Laffan Port | 15/04/2015 |
116 | Boskalis | Underwater Inspection For "Taurus II" Vessel BV Class | Simisima | 15/04/2015 |
117 | NKOM | Docking Operation For Al Jasra Vessel | Ras Laffan Port | 10/04/2015 |
118 | Allianz Marine & Qatar Gas | Replacement Of 1 X Fender At QG WHP-7 | NFB Qatar Gas Field Offshore | 09/04/2015 - 12/04/2015 |
119 | Boskalis | Underwater Cleaning For "Taurus II" Vessel | Siemesma | 05/04/2015 |
120 | NKOM | Underwater Inspection (UWILD) For "Halul 63" Vessel | Ras Laffan Port | 04/04/2015 |
121 | Zakher Marine | Underwater Inspection For " Zakher Emperor" Vessel | Doha Port | 27/03/2015 |
122 | UCC | Supplying And Installation Of D-Fender For Banana Island And Shiokh Port Jetties | Banana Island Shiokh Jetty | 28/03/2015 - 10/04/2015 |
123 | NKOM | Lifting Operation For "LB 11" Vessel | Ras Laffan Port | 27/03/2015 |
124 | MFH | Underwater Cleaning Propeller, Sea Chest, Rudders | Doha Port Anchorage Area | 23/03/2015 |
125 | Resolve | Salvage Operations For "Al Salamah Barge | Mesaieed Port | 05/03/2015 - 19/03/2015 |
126 | NDSQ | Lifting Operations For "Al ADIAD" Vessel | Ras Laffan Port | 04/03/2015 |
127 | NKOM | Diving Operations For "Halul 12" | Ras Laffan Port | 03/03/2015 |
128 | NKOM | Diving Services For Inspection Of Port Outboard Jet Bucket | Ras Laffan Port | 26/02/2015 |
129 | NKOM | Lifting Operation For "Halul 11" Vessel | Ras Laffan Port | 13/02/2015 |
130 | NKOM | Docking Operation For "AHT SCOUT" Vessel | Ras Laffan Port | 10/02/2015 |
131 | NKOM | Docking Operation For "RV_JANAN" Vessel | Ras Laffan Port | 08/02/2015 |
132 | NKOM | Removal Of PP Rope For "MV_Gloria" Vessel | Ras Laffan Port | 07/02/2015 |
133 | UCC | Underwater Welding Fenders For Pile (2 Ton Fender Weight) | Banana Island | 30/01/2015 |
134 | Brand Marine Consultant | Under Water Salvage For "AL Salamah" Barge | Mesaieed Port | 28/01/2015 - 02/02/2015 |
135 | NKOM | Lifting Operations For "BKS-292" Vessel | Ras Laffan Port | 26/01/2015 |
136 | NKOM | Diving Operations For "AHT SCOUT" And "TOPAX SHAHEEN" Vessels | Ras Laffan Port | 24/01/2015 |
137 | Boskalis | Bottom Survey On The Guayas – BV Class | Semaisma | 19/01/2015 |
138 | NKOM | Diving Operation For 'SM 1 Reem' | Ras Laffan Port | 18/01/2015 |
139 | NDSQ | Lifting "AL SAILIYA" Yacht At Phase #5 | Ras Laffan Port | 15/01/2015 |
140 | NKOM | Lifting Boat At Phase #5 BKM 102 | Ras Laffan Port | 13/01/2015 |
141 | NKOM | Collecting Drowned Hook | Ras Laffan Port | 09/01/2015 |
142 | NKOM | Lifting Boat At Phase #5 BKM 103 | Ras Laffan Port | 06/01/2015 |
143 | NKOM | Lifting Boat At Phase #5 M/Y ZIKRIT | Ras Laffan Port | 04/01/2015 |
144 | NKOM | Lifting Supply TGB 22 | Ras Laffan Port | 01/01/2015 |
145 | Zakher Marie | UWILD Zakher Vessel | Doha Port | 24/12/2014 |
146 | NKOM | Assisting Vessel Docking DSV SHADDAD | Ras Laffan Port | 23/12/2014 |
147 | SVITZER | Installing A New Man Hole On SALAMA Barge | Mesaieed Port | 09/12/2014 - 11/12/2014 |
148 | NKOM | Diving Operation For Laffan #1 Barge | Ras Laffan Port | 05/12/2014 |
149 | NKOM | Diving Operation For MIRQAB Vessel Lifting | Ras Laffan Port | 30/11/2014 |
150 | NKOM | Underwater Cutting For Pad Eye 150mm And Remove The Hook | Ras Laffan Port | 17/11/2014 |
151 | NKOM | Seabed Survey For Dixie Patriot | Ras Laffan Port | 09/11/2014 |
152 | NKOM | Emergency Docking For DIXIE PATRIOT | Ras Laffan Port | 29/10/2014 |
153 | Qatar Quarries & Building Materials | Underwater Survey For Laffan 1 Barge ABS Class | Ras Laffan Port Area M16 | 30/09/2014 |
154 | NKOM | Docking Operation In Dock #2 | Ras Laffan Port | 29/09/2014 |
155 | Trelco Marine | In-Water Bottom Survey For SCOUT Tug Boat DNV GL Class | Ras Laffan Port | 11/09/2014 |
156 | MEDCO | In-Water Bottom Survey For AL JARRAF Vessel BV Class | New Mesaieed Port | 26/08/2014 |
157 | MSC | In Water Survey For MSC CAPRI GL Class | Doha Port | 18/07/2014 |
158 | MILAHA | In Water Survey For AL RUFFA 1 Dock Lloyd's Class | Mesaieed Port Milaha Ship Yard | 09/07/2014 |
159 | MILAHA | Maintenance For Berth 6 - Milaha | Doha Port | 26/06/2014 - 3/07/2014 |
160 | Global Marine Services | In Water Survey For SHIRF HAWK BV Class | Ras Laffan Port | 23/06/2014 |
161 | China Harbour | Clearing A Fouling Rope On Tug DONA – 1 | Lussil | 01/06/2014 |
162 | Six Construct | Environmental Works (Survey On Corals Reef ) (Ecological Survey) | Mesaieed Port | 15/05/2014 - 30/05/2014 |
163 | Nakilat Agency | Remove Rope From Propeller Tug Fahad 1 | Ras Laffan Port | 30/04/2014 |
164 | Halul H.O.S.C | Underwater Inspection And Propeller Polishing For Halul 36 | Ras Laffan Port | 30/04/2014 |
165 | UCC | Welding Fenders To Piles | Banana Island | 27/04/2014 - 30/04/2014 |
166 | B Navi Ship Management | In Water Survey For ATLANT TRINA GL Class | Doha Port | 26/04/2014 |
167 | N KOM | SPUD CAN UWILD INTERMEDIATE SURVEY For AL DOHA RIG ABS Class | Ras Laffan Port | 28/04/2014 - 03/05/2014 |
168 | N KOM | Seabed Survey For AL DOHA RIG | Ras Laffan Port | 25/04/2014 |
169 | UCC | Air Lifting Remove Sand Of The Seabed Using Air Lift To Weld The Anode | Banana Island | 25/04/2014 |
170 | N KOM | Seabed Survey In Pier -2 East | Ras Laffan Port | 22/04/2014 |
171 | NSW | Underwater Survey Al - Dakhira Vessel | Ras Laffan Port | 18/04/2014 |
172 | NSW | Underwater Survey HELAITAN Vessel | Ras Laffan Port | 12/04/2014 |
173 | NSW | Underwater Survey HAWAR Vessel | Ras Laffan Port | 11/04/2014 |
174 | N-KOM | Spud Can Uwild Intermediate Ensco 97 Rig Abs Class | Ras Laffan Port | 05/04/2014 - 09/04/2014 |
175 | Archirodon | Wrapping Of Gio-Textile Material On Piles | Ras Laffan Port | 11/03/2014 - 18/03/2014 |
176 | UCC | DENSO Roto Wrap Pile Jacketing | Banana Island | 01/03/2014 - 16/03/2014 |
177 | NKOM | Lifting Boat Hadd Al Theeb | Ras Laffan Port | 22/02/2014 |
178 | NKOM | Seabed Survey To Rig Foot Print | Ras Laffan Port | 15/02/2014 |
179 | NKOM | Spud Can Uwild Intermediate Ensco 96 Rig Abs Class | Ras Laffan Port | 15/02/2014 - 20/02/2014 |
180 | Nakilat Agency | Jammed Propeller Of Tug Fahad | Ras Laffan Port | 14/02/2014 |
181 | Zakher Marin | Jammed Propeller/Rudder | Ras Laffan Port | 11/02/2014 |
182 | NKOM | Boat Launching (Bourbon Agathe) | Ras Laffan Port | 29/01/2014 |
183 | NKOM | Boat Launching (OPUA MULTICAT) | Ras Laffan Port | 23/01/2014 |
184 | MEDCO | General Visual Inspection For The Mooring System | Mesaieed Port | 21/01/2014 |
185 | NKOM | Lifting Boat For AL SHAMAL-PHASE 5 | Ras Laffan Port | 17/11/2013 |
186 | UCC | Underwater Welding For 2000 Zinc Anodes | Water Villa Piles Banana Island Jetty | 27/10/2013 |